
Electrical BIM & VDC Training Program Applications are Open | APPLY NOW
Pre- and post-contract BEPs tailored to your project scope
Roles, uses, software, and LODs defined and agreed
Compliant with ISO and owner-specific protocols
Built to reduce risk, clashes, and confusion across trades
























Watch our BIM Execution Plan in action covering pre-contract planning through post-contract coordination. You’ll see how structured workflows, trade-specific sequencing, and milestone tracking help projects hit deadlines without last-minute chaos.
We model every mechanical system with the accuracy, logic, and coordination your field teams need.
Clear definition of project BIM objectives and applications to guide every stage.
Scheduled checkpoints for model submissions, reviews, and approvals.
Detailed list of responsibilities with names, titles, and discipline-specific contacts.
Trade-wise LOD requirements to ensure the right detail at the right stage.
Step-by-step processes for model creation, coordination, and sign-off.
Agreed authoring tools and delivery formats (PDF, RVT, NWC, IFC, etc.).
Defined methods to detect, track, and resolve clashes across trades.
Quality control processes with scheduled audits for compliance.
Structured data for handover, FM, and lifecycle asset management.
Eracore supports projects that need:
From pre-contract strategy to post-contract delivery, we cover every detail your project needs to stay coordinated and compliant.
Clear definition of BIM objectives, applications, and project scope to guide every stage.
Scheduled data drops with trade-specific LOD matrices to ensure the right detail at the right time.
Defined duties with discipline-specific contacts for seamless collaboration.
Step-by-step processes for model creation, coordination, sign-off, and version control.
Agreed authoring platforms, delivery formats, and workflows for detecting, tracking, and resolving clashes.
Scheduled audits, compliance checks, and optional COBie or asset tagging for smooth handover and FM integration.
Many contractors do not have dedicated BIM planning resources in-house. Preparing a BIM Execution Plan requires coordination between project managers, BIM coordinators, and discipline modelers.
Eracore supports contractors by preparing BEPs that clearly define modeling workflows, coordination rules, and project milestones before modeling begins.
Whether it’s early planning or active construction, we create the right BIM execution plan for your project stage clear, coordinated, and ready to deploy.
Pre-contract BEP: Created during the bidding or RFP phase. Outlines proposed BIM workflows, uses, standards, and capabilities. Shows you’re prepared.
Post-contract BEP: Developed after contract award. Finalizes team roles, software, model detail levels, collaboration platforms, and review protocols.
Need a custom plan for a tight timeline? We’ve got your back.
We don’t just write plans, we build them to work in the real world.
From field-informed templates to ISO-aligned workflows, our BEP services are built to meet the needs of real construction teams.
A closer look at builds where collaboration ran deep and precision paid off, turning complex scopes into field-ready success stories.

El Paso, TX

347,696 sq ft sq ft

1
"Job well done. The models were accurate, the coordination was solid, and the project stayed on track."

El Paso, TX

347,696 sq ft sq ft

1
"Fast responses, good communication, and quality models. No complaints from our side."

El Paso, TX

316,065 sq ft sq ft

1
"Fast responses, good communication, and quality models. No complaints from our side."

VA

271,159 sq ft

3
"One of the easiest BIM teams we've worked with. Responsive, organized, and dependable."

OH

167,346 sq ft

1
"Job well done. The models were accurate, the coordination was solid, and the project stayed on track."

OH


1
"They understood the challenges of data center construction and delivered exactly what was promised."
A BIM execution plan identifies the way in which BIM is to be used over the course of a project. It also guarantees uniformity, coordination and abidance of all the trades and stages of a project.
A pre-contract BEP outlines the method in which BIM is to be utilized and a post-contract BEP either captures the agreed approach after award, roles, deliverables and model workflows.
To write one, specify BIM objectives, roles, model applications, LODs, clash detection processes, software, quality assurance/quality control processes and formats of delivery. Or leave us to do it.
A responsibility matrix is developed on authorship, coordination, reviews, and approvals of all the disciplines giving major contacts specific names and titles.
Yes, each BEP has a trade-wise LOD matrix and a clash detection process step-by-step applied with tools such as Navisworks or BIM Track.
Absolutely. We consider it a living document which will be able to be changed during coordination or scope changes.
Yes. We apply our BEPs to be compliant with ISO 19650 BIM standards and tailor to the needs of owners or jurisdiction requirements.
Variably 5-7 days business, unless the project is simple. More rapid schedules on high priority requirements.
To get the most out of this process we suggest you include your VDC lead, BIM coordinator, project manager, and any other model authors specific to trades.
Discover insightful articles featuring BIM strategies, industry trends, practical tips, and software tricks, and more to keep you ahead of the curves.