Electrical BIM & VDC Training Program Applications are Open | APPLY NOW

Data Center, New Albany, OH

For this large-scale facility in New Albany, OH, our team provided end-to-end BIM services for electrical power, low voltage, and fire alarm systems. Spanning over 552,000 sq ft across two floors, the project required precise LOD 400 modeling, coordination, and construction documentation to support efficient installation and long-term performance.

Request Case Study Walk-Through

We showcase only a few projects publicly due to client confidentiality. Contact us to review this specific case study.

Project Details 

Name:

Confidential

Project Type:

Mission Critical

Services Provided:

Electrical BIM Modeling, Coordination, and Installation Documents

Scope Team Size:

6-7 dedicated electrical BIM modelers & coordinators

LOD:

400

Software & Applications:

Revit, Navisworks, and Procore

Project Challenges

  • Large-scale BIM modeling of electrical power, low voltage, and fire alarm systems at LOD 400.
  • Coordination across multiple trades to eliminate clashes in a two-floor facility.
  • Delivering comprehensive, field-ready construction documents that met strict quality standards.
  • Ensuring deliverables were fully compatible with The Superior Group’s workflows in Procore.

Our Deliverables

  • Complete BIM models and construction documents covering electrical systems.
  • Coordination packages providing clash-free, constructible designs.
  • Detailed shop drawings aligned with field installation processes.
  • Final deliverables optimized for seamless use in Revit, Navisworks, and Procore.

Get a Fast, Detailed Proposal

Next Steps

You can also schedule a call to discuss your project details