
Electrical BIM & VDC Training Program Applications are Open | APPLY NOW
























Overhead feeders often cross mechanical, plumbing, and structural systems. This walkthrough shows how our models plan feeder conduit routing, hanger placement, and clearances before installation begins.
Our feeder BIM layouts include everything required for coordination, installation, and inspection.
Looking for complete electrical coordination? Explore our Electrical BIM Services.
A step-by-step approach to ensure feeder layouts are accurate, compliant, and install-ready.
Send us your electrical drawings and we’ll develop coordinated overhead feeder layouts ready for prefab, inspection, and installation.
A closer look at builds where collaboration ran deep and precision paid off, turning complex scopes into field-ready success stories.

El Paso, TX

347,696 sq ft sq ft

1
"Job well done. The models were accurate, the coordination was solid, and the project stayed on track."

El Paso, TX

347,696 sq ft sq ft

1
"Fast responses, good communication, and quality models. No complaints from our side."

El Paso, TX

316,065 sq ft sq ft

1
"Fast responses, good communication, and quality models. No complaints from our side."

VA

271,159 sq ft

3
"One of the easiest BIM teams we've worked with. Responsive, organized, and dependable."

OH

167,346 sq ft

1
"Job well done. The models were accurate, the coordination was solid, and the project stayed on track."

OH


1
"They understood the challenges of data center construction and delivered exactly what was promised."
Projects with large electrical infrastructure require careful coordination between design, installation, and inspections. Our BIM layouts support the teams responsible for planning and installing these systems.
Because every feeder layout is modeled to install right.
It means the process of laying large feeder conductors through overhead conduits to distribute power within a facility.
By including NEC-compliant feeder distribution rules, clearances and sizing at the beginning of the modeling process.
BIM enables detection of clashes, trades do conduct sizing of conductors, as well as coordination of routes of feeder conductors among various trades.
Yes, the Revit overhead feeder modeling determines conduit paths, hangers, and supports within high accuracy.
Long spans can conflict with HVAC and plumbing, and must have some sort of support to the hanger, and must be carefully planned with the load.
By eliminating the need to reroute costly in the field by solving conflicts in the model before construction.
Yes, planning of feeder installation in BIM allows prefab assemblies, which are installed faster and safer.
Discover insightful articles featuring BIM strategies, industry trends, practical tips, and software tricks, and more to keep you ahead of the curves.